How to prioritise IT risks: likelihood × impact

September 23, 2026 2 min read
Indicator de tip vitezometru, în nuanțe de roșu și portocaliu

Every security assessment produces a list of risks. The challenge is not identifying them, but deciding what to fix first. At Dataeye we start from a simple principle: we separate what is critical from what is just a box to tick. The basic tool is assessing each risk on two axes: likelihood and impact.

Likelihood: how credible is the scenario?

We use a scale from 1 to 5:

  • 1 – Rare: an exceptional event, with no relevant indicators;
  • 2 – Unlikely: it may occur under certain conditions;
  • 3 – Possible: a credible scenario, supported by concrete factors or dependencies;
  • 4 – Likely: there are clear signals or insufficient controls;
  • 5 – Almost certain: the risk is imminent, recurring or already materialising.

Impact: what happens if the risk materialises?

Impact is also assessed on a scale from 1 to 5, from Very low (a minor effect, with no significant consequences) to Critical (it may lead to business disruption, operational incidents or serious consequences). What matters is not only the technical perspective, but also the effect on the business: service availability, data confidentiality, legal obligations and reputation.

From score to decision

Combining the two scores gives you the exposure level of each risk. A likely risk with critical impact goes to the top of the list; a rare risk with low impact can be monitored or accepted temporarily, in a deliberate and documented way.

To keep decisions fast and predictable, we set tolerances and escalation thresholds from the start. Low or moderate risks are handled at operational level, high risks are analysed in project meetings and critical risks are escalated without delay to the appropriate decision-making level.

Every risk has an owner

A list of risks without owners remains just a list. Every risk in the register has a designated owner, and response actions are assigned and tracked through to completion. Risks are reassessed periodically, because the context changes too: new systems, new vendors or new requirements appear.

The result is a clear action plan: what needs to be fixed, in what order, with what resources and within what timeframe. That is what turning technical information into clear decisions and concrete steps means.

Articles you might also be interested in

enisa

ENISA has published a guide for software component inventorying

On October 22, 2026, ENISA published a practical guide for SBOM adoption: the Software Bill of Materials. The document specifically targets SMEs and aims to increase transparency in the software supply chain. The guide covers the architecture, data flows, and security measures required throughout the SBOM lifecycle. The goal is to transform component information into […]

November 2, 2026 1 min read
Glob digital format dintr-o rețea de puncte luminoase

Audit, penetration testing or consulting: where do you start?

Three services, three different questions: where do I stand, what could happen and what do I do next. Here is how to choose the right starting point for your organisation.
October 28, 2026 3 min read
Scut de securitate cu bifă și stelele Uniunii Europene

NIS2 in brief: what it means for organisations in Romania

NIS2 sets clear cybersecurity requirements for organisations in essential and important sectors. Here is what the directive covers and how to prepare in practice.
October 21, 2026 2 min read